New routes for Cycle for Crumlin
Due to unforeseen road closures Murphy Surveys have been left with no choice but to alter the routes of their Cycle for Crumlin next weekend.
A lot of effort has gone into re-arranging them thanks to Liam Walker and Kilcullen CC.
The 50K route is shown above and the 100K will be updated very soon. The changes will be emailed to all who have already registered their interest.
A lot of effort has gone into re-arranging them thanks to Liam Walker and Kilcullen CC.
The 50K route is shown above and the 100K will be updated very soon. The changes will be emailed to all who have already registered their interest.